SAFETY • QUALITY • TRACEABILITY

SAFETY & QUALITY

Safe Work, Documented Quality and Traceable Material — Built Into How We Supply, Fabricate and Stage Piping Projects.

DISCUSS YOUR PROJECT REQUIREMENTS →

SAFETY PRACTICES CLIENTS EXPECT

Excavation & trenching (OSHA 29 CFR 1926 Subpart P): Cave-in protection, competent-person inspection and utility locating for underground plumbing and utility tie-ins.
Confined spaces (Subpart AA): Sewer lines, manholes and pump stations are permit-required confined spaces: atmospheric testing, ventilation, entry permits and rescue capability.
Hot work & brazing: Hot-work permits, fire watch, pressure-rated purge and brazing procedures for process and medical gas piping.
Site-specific safety plans: Written plans, hazard communication, fall protection and training records aligned with OSHA's recommended practices for construction.

QUALITY & DOCUMENTATION

Submittals to approved drawings: Product data, shop drawings and listings reviewed against the specification before release.
Material traceability: MTRs, heat numbers, cut sheets, NSF/ANSI 61 / 372 listings and BABA documentation available when specified on the PO.
Testing & flushing records: Pressure tests, leak tests, flushing and disinfection records, and verifier documentation where applicable.
Turnover documentation: Closeout packages, as-builts and O&M information assembled for owner and inspector review.

OSHA is the baseline. Owner prequalification (EMR, TRIR/DART, OSHA history) is typical on commercial, industrial and government work.

NEED SAFETY OR QUALITY DOCUMENTS FOR PREQUALIFICATION?

Tell us what your project requires and we will respond with what we can provide.

CONTACT US →